Petty cash on site is where small costs disappear. A bag of fixings from the hardware shop down the road. Fuel for a generator. Water and ice for the crew in summer. A taxi to collect a missing part. Each is small, each is paid in cash, and each leaves a receipt in someone’s pocket.
Site petty cash is the float a contractor gives site teams to cover small, urgent purchases that cannot wait for a purchase order. Every live project needs it. Managed loosely, it becomes a monthly leak of cost, VAT and control.
The amounts look trivial on their own. Across several sites and twelve months, they rarely are.
The typical cycle is familiar. A site engineer receives a float, spends it over a few weeks, and submits a bundle of receipts to be replenished. Some receipts are faded thermal paper. Some are handwritten. Some are missing. Accounts spends hours matching what is left to the amounts claimed, then books most of it to a general site expense line.
By then the link to the project, the cost code and the reason for the purchase is gone. Petty cash shows up in the accounts, but not against the work it paid for. It is the same kind of gap we described in our piece on labour allocation, where cost is right in total and wrong by project.
Every lost or unclear receipt is VAT the business may not recover. To recover input tax in the UAE, a business generally needs a valid tax invoice from the supplier, and receipts that fall short of the requirements, or cannot be produced at all, put that recovery at risk.
The bar is rising. KPMG’s summary of FTA Decision No. 13 of 2026 explains that, from 1 October 2026, businesses must carry out due diligence on suppliers and supplies before recovering input VAT, and that the FTA can deny recovery where the checks were not done and the supply is linked to tax evasion. Small cash purchases from unknown suppliers are exactly where those checks are hardest to evidence.
As e-invoicing rolls out in the UAE, which we covered in UAE e-invoicing for construction companies, the gap between properly documented purchases and loose cash receipts will become more visible, not less.
The direct cost is unrecovered VAT and costs that cannot be allocated. The indirect cost is time. Site engineers spend hours collecting receipts and filling in claim forms. Accounts staff spend more hours checking them. Floats run out mid-week, and site teams either wait or pay from their own pockets and claim later.
There is also a control risk. Cash is the hardest spend to audit. Without a clear record of who spent what, on which project and why, small irregularities go unnoticed until they are no longer small.
Enough to cover a typical week or two of small, urgent purchases, set per site based on actual spending history. Larger or recurring purchases should go through purchase orders instead.
Generally yes, if the purchase is for business use and is supported by a valid tax invoice that meets FTA requirements. Purchases without proper documentation put recovery at risk. A tax adviser can confirm the treatment for specific cases.
Record each expense when it happens, with a photo of the receipt, the project, the cost code and the reason. Replenish floats against approved records rather than bundles of paper, and review spending by site each month.
The fix is recording each purchase at the point of spend. The site engineer photographs the receipt on a phone, tags the project and cost code, and submits it the same day. Accounts approves against a clear record, VAT details are captured from a readable document, and every dirham lands against the work it paid for.